Equipment for Data Center Commissioning
Data centre commissioning requires load banks and temporary cooling to validate power and thermal systems before go-live, often alongside backup generators for integrated systems testing.
Equipment commonly used
Load Banks
Resistive and reactive load banks for generator and UPS commissioning tests.
View detailsGenerators
Diesel generator rental from small temporary-power units to large project gensets.
View detailsTemporary Cooling
Temporary chillers for standby HVAC, process cooling and climate-sensitive storage.
View details